Step 1 of 1

This permit becomes null and void if work or construction authorized by this permit is not commenced within 180 days, or if construction or work is suspended or abandoned for a period of 180 days at any time after work has commenced. 

I hereby certify that I have read and examined this application and know the same to be true and correct. All provisions of law s and ordinances governing this type of work will be complied with whether specified or not. The granting of a permit does not presume to give authority to violate or cancel the provisions of any other local or state law regulating construction or the performance of construction. Permits when issued do not nullify any deed restriction validly filed of record. I also agree to install appropriate erosion control measures in order to avoid dirt, sand and other material from accumulating within public street right-of-way.

Please fill out and submit the application if you agree with the statements above.

* Denotes a required field
The following information must be supplied in order to process and issue your permit. An incomplete application will only delay your project until the information is obtained. Please take the time to fill this application out to avoid unnecessary delays.

Job Site Information

 
*
*
*
ZIP*
-
Second portion of ZIP Code is optional.
*
*
*
*
*
*
*

Contractor Information

*
*
*
*
ZIP*
-
Second portion of ZIP Code is optional.
*
Phone*
-- ext
Fax 
-- ext
*
*
*
*
*
Proposed Use*
Type of Work*
Describe Work*
*

Structure and Lot Information

Type of Construction*
Occupancy Type*
Division*
Below, please provide the following information: Lot size sq. ft., Width of lot, depth of lot, building width, building depth, building height, 1st floor sq. ft., 2nd floor sq. ft., basement sq. ft., and addition remodel sq. ft.
*
*
This project will include:*
*
*
*
*
*
*
Is Property in Flood Hazard Area*
*
*
Please click submit when finished.